[1]
2026. Task-Based Risk Scoring for Early Prediction of Cost and Time Overruns in Construction Projects. Architecture Image Studies. 7, 1 (Jan. 2026), 1013–1025. DOI:https://doi.org/10.62754/ais.v7i1.983.